Enter the total wall area in square feet. For each wall, multiply length by height and add them up, and for gable ends add ½ × width × peak height. Enter the area of windows and doors to subtract, or leave it at 0. A standard door is about 21 sq ft and a typical window 12 to 15 sq ft. Choose the wall type: framed walls need metal lath, while concrete block and poured concrete bond directly and need none. Then set the total thickness: 0.875 for a traditional three-coat system, 0.375 to 0.5 for a one-coat system, or 0.125 to re-coat existing stucco with a new finish. Tap Calculate to get 80 lb bags of base coat and finish coat with 10% waste, the metal lath sheets for the scratch coat, and a material cost range.
How many bags of stucco do I need?
500 sq ft of framed wall with three-coat stucco needs 46 bags of 80 lb base coat, 8 bags of finish coat, and 35 sheets of metal lath.
| Wall area and system | Base coat bags | Finish coat bags | Lath sheets |
|---|---|---|---|
| 100 sq ft, 3-coat (7/8 in), framed | 10 | 2 | 7 |
| 500 sq ft, 3-coat (7/8 in), framed | 46 | 8 | 35 |
| 1,000 sq ft, 3-coat (7/8 in), framed | 92 | 16 | 69 |
| 500 sq ft, 2-coat (5/8 in), block | 31 | 8 | — |
| 1,000 sq ft, finish re-coat (1/8 in) | 0 | 16 | — |
Quantities include the 10% waste allowance the calculator uses. Block and poured concrete need no lath. Page updated .
How to Calculate Stucco
Traditional three-coat stucco is built up in layers: a 3/8 inch scratch coat, a 3/8 inch brown coat, and a 1/8 inch finish coat, for 7/8 inch in total. The calculator treats the last 1/8 inch as finish coat and everything under it as base coat.
Volume: net wall area × thickness in inches ÷ 12 = cubic feet. Add 10% for waste, which on stucco covers droppings, uneven framing, and corners.
Bags: an 80 lb bag of premixed stucco yields about 0.75 cubic feet. That covers roughly 24 sq ft at 3/8 inch and 72 sq ft at 1/8 inch.
Worked example: 500 sq ft of wall with no openings. Base coat at 3/4 inch: 500 × 0.75 ÷ 12 × 1.10 = 34.4 cubic feet ÷ 0.75 = 46 bags. Finish coat at 1/8 inch: 500 × 0.125 ÷ 12 × 1.10 = 5.7 cubic feet ÷ 0.75 = 8 bags.
Lath: a 27 × 96 inch sheet of metal lath covers 18 sq ft, or about 16 sq ft after lapping the edges. 500 sq ft × 1.10 ÷ 16 = 35 sheets. Over block or poured concrete, skip the lath. Two coats (about 5/8 inch) are typical there, because masonry is already flat and rigid.
Stucco Tips
Put the water barrier on first. Over wood sheathing, install two layers of grade D building paper or an equivalent weather-resistive barrier, lapped shingle-style, before the lath. Stucco is not waterproof, and water that gets behind it has to drain out.
Install a weep screed at the bottom of every wall. Building codes generally require it at least 4 inches above soil or 2 inches above paving, so water drains out instead of rotting the sill plate.
Scratch the first coat. Rake horizontal grooves into the scratch coat while it is still soft so the brown coat locks in. Keep each coat damp by misting it two or three times a day for the first 48 hours. Stucco that dries too fast cracks.
Give the brown coat time. Traditional practice is to wait about 7 days before the finish coat so most shrinkage cracks show up and get covered. Check the bag for the minimum.
Work wall by wall and stop at corners, control joints, or trim. A finish coat that dries partway across a wall leaves a visible line. For large repairs, mix your own base coat from Portland cement, lime, and plaster sand at about 1 part cement to 3 parts sand. It costs far less than premixed bags.
What to Buy
Base coat: premixed 80 lb bags of base coat stucco (Quikrete and Sakrete sell them at home centers for about $12 to $18) contain cement, lime, sand, and fibers, so you only add water. For whole-house jobs, a supply yard can quote Portland cement, Type S lime, and plaster sand in bulk.
Finish coat: 80 lb bags of finish coat stucco, white or tinted, for about $20 to $35. Buy every bag of a color from the same batch, and add pigment by weight if you tint it yourself.
Lath and accessories: 2.5 lb or 3.4 lb expanded metal lath (27 × 96 inch sheets), galvanized staples or roofing nails, weep screed, corner bead, casing bead around openings, and control joints. Expect about $8 to $15 per lath sheet.
Tools: a hawk and pool trowel, scratcher, darby, and a mortar mixer or 1/2 inch drill with a paddle. Paint over cured stucco? Use our exterior paint calculator and expect lower coverage on rough texture.
Frequently Asked Questions
How many bags of stucco do I need per square foot? +
How thick should stucco be? +
How much stucco do I need for a 2,000 square foot house? +
Do I need metal lath for stucco? +
How long does stucco take to cure? +
Should I subtract windows and doors? +
Embed This Calculator on Your Website
Run a contractor, supply, or DIY site? Add this free Stucco Calculator to any page. Copy the code below and paste it into an HTML block. It is free, needs no sign-up, and has no ads inside.
Related Calculators
Exterior Paint Calculator
Calculate how many gallons of exterior paint you need for any house size.
Concrete Calculator
Calculate concrete volume in cubic yards, estimate bag counts, and determine material costs for slabs, driveways, footings, and any pour.
Drywall Calculator
Calculate sheets, joint compound, and screws for walls and ceiling.
Sand Calculator
Calculate cubic yards, tons, and bag count for sandboxes, paving bases, and any fill project.