Enter the length and width of the patio, walkway, or driveway in feet. Then enter the face size of one paver in inches. A standard holland brick paver is 4 × 8 inches, and square patio slabs are often 12 × 12 or 16 × 16. Set the base depth: 4 inches of compacted gravel for patios and walkways, 6 inches on clay soil, and 8 to 12 inches for driveways. Tap Calculate to get the number of pavers with 10% waste, the gravel base in cubic yards and tons, the 1 inch layer of bedding sand in 50 lb bags, and polymeric sand for the joints. For L-shaped areas, run each rectangle separately and add the results, or measure the total with our square footage calculator.
How many pavers do I need for a patio?
A 10 × 10 ft patio needs 495 standard 4 × 8 inch pavers, 1.36 cubic yards of gravel base at 4 inches, and 19 bags of bedding sand.
| Patio | 4 × 8 pavers | Base (yd³) | Bedding sand (50 lb) | Polymeric sand (50 lb) |
|---|---|---|---|---|
| 10 × 10 ft patio | 495 | 1.36 | 19 | 2 |
| 12 × 12 ft patio | 713 | 1.96 | 27 | 3 |
| 12 × 16 ft patio | 951 | 2.61 | 36 | 4 |
| 16 × 20 ft patio | 1,584 | 4.35 | 59 | 6 |
| 20 × 20 ft patio | 1,980 | 5.43 | 74 | 8 |
Quantities include the 10% waste allowance the calculator uses. Page updated .
How to Calculate Pavers
A paver job has three layers, and each one is a separate calculation.
Pavers: divide the area by the face area of one paver. A 4 × 8 inch paver covers 32 ÷ 144 = 0.222 sq ft, so you need 4.5 pavers per square foot. For a 10 × 10 patio: 100 sq ft × 1.10 waste ÷ 0.222 = 495 pavers.
Gravel base: area × base depth in inches ÷ 12 ÷ 27 gives cubic yards. At 4 inches: 100 × 4 ÷ 12 ÷ 27 = 1.23 cubic yards, or 1.36 with waste. Crushed stone weighs about 1.4 tons per cubic yard, so that is about 1.9 tons.
Bedding sand: the screeded layer is 1 inch thick. 100 sq ft × (1 ÷ 12) = 8.3 cubic feet, or 9.2 with waste. At 0.5 cubic feet per 50 lb bag, that is 19 bags.
Joint sand: one 50 lb bag of polymeric sand typically covers 30 to 100 sq ft depending on the joint width. This calculator uses 60 sq ft per bag plus 10% waste, so a 100 sq ft patio needs 2 bags.
Pavers Tips
The base does the work, not the pavers. Most paver failures (sinking, rocking, weeds pushing through) come from a thin or poorly compacted base. Dig out topsoil until you reach firm subsoil, lay geotextile fabric on soft or clay ground, then add crushed stone in 2 inch lifts and run a plate compactor over each lift. A single 6 inch dump compacted once will settle.
Extend the base 6 to 12 inches past the paver edge on every side. That is where the edge restraint sits, and pavers at the edge carry the least support. Add that extra width to your dimensions when you calculate the gravel.
Screed the sand, don't pack it. Bedding sand should be a loose, level 1 inch layer that the pavers settle into when you compact them. Use coarse concrete sand. Stone dust holds water and play sand is too fine.
Slope the surface away from the house at 1/4 inch per foot so water runs off instead of sitting under the pavers.
Sweep polymeric sand in only when everything is bone dry, compact once more, then mist it lightly. Too much water washes the binder out and leaves haze on the pavers.
What to Buy
Pavers: concrete pavers cost $2 to $5 per sq ft at home centers and landscape yards. Buy by the pallet for anything over about 100 sq ft, and pull from several pallets as you lay them so color variation blends.
Base: 3/4 inch crushed stone with fines, sold as road base, crusher run, or Class 5 depending on your region. Order bulk for anything over one cubic yard. It is far cheaper than bags. Our gravel calculator converts the base to tons for quarry orders.
Sand: coarse concrete sand for bedding, and a polymeric joint sand rated for your joint width. Check the bag for maximum joint width before buying. For a sand-only quote, use the paver sand calculator.
Also budget for plastic or aluminum edge restraint, 10 inch spikes, and a plate compactor rental, which runs about $80 to $100 per day.
Frequently Asked Questions
How many pavers do I need for a 10×10 patio? +
How many pavers are in a square foot? +
How deep should the gravel base be under pavers? +
How much sand do I need under pavers? +
How much polymeric sand do I need? +
How much extra should I buy for cuts? +
Embed This Calculator on Your Website
Run a contractor, supply, or DIY site? Add this free Paver Calculator to any page. Copy the code below and paste it into an HTML block. It is free, needs no sign-up, and has no ads inside.
Related Calculators
Paver Sand Calculator
Calculate bedding sand and joint sand for paver patios and walkways. Get cubic yards, tons
Gravel Calculator
Calculate cubic yards and tons of gravel for any driveway, path, or landscaping project.
Gravel Patio Calculator
Calculate cubic yards and tons of gravel for a patio with cost estimates.
Concrete Slab Calculator
Calculate cubic yards and bag counts for patios, garage floors, pool decks, and sidewalks.